DDP.AE-2
Regular price $3,455.00 Save $-3,455.00Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that's been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.
Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2
Details: