DDP.AE-1
Regular price $3,455.00 Save $-3,455.00Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1
Details: